Looking at the 'road-bend' construction. The bridge to court-house square is in the distance. The River Walk from Heritage Park's pavilion to the place I'm standing can be visualized with a little imagination. The 'road' down in the river is for equipment to get down to the bottom of the slope. The heavy equipment is building up the river bank and needs some way to get in and out of the river. Widening the bank to make room for the River Walk is a big project..
Looking at the 'road-bend' from the other side. The Paluxy weir is down stream (NE), in this general direction.
'Construction central': the equipment and construction materials have to have a home somewhere.
Sunday, July 26, 2009
Sunday, July 19, 2009
Progress on future boat dock
Monday, July 13, 2009
Work along the river edge
Trail cleared
Over the weekend, I walked from Heritage Park to the weir and back. A lot had changed, and I took too many photos.
It looked like all the clearing had been completed. A temporary road has been built below the narrow portion of trail adjacent to Heritage park. The temporary road is right on the river. The temporary fence at the end of Grand has been removed, allowing construction to proceed all the way from Heritage Park to the Paluxy weir.
It looked like all the clearing had been completed. A temporary road has been built below the narrow portion of trail adjacent to Heritage park. The temporary road is right on the river. The temporary fence at the end of Grand has been removed, allowing construction to proceed all the way from Heritage Park to the Paluxy weir.
Wednesday, July 8, 2009
July 4th holiday weekend
Some clearing took place last week, but nothing seemed to call for a photo.
Subscribe to:
Posts (Atom)